Week 3

 

The second week of drilling went very well and we are right on schedule. With 11 holes done, we should be finished on schedule at the end of the fourth week of drilling.  We have a closed loop system, which means we do not use any ground water.  The saturated sand composition of the ground is actually conducive to conductivity and will enhance the effectiveness of our geo-thermal system.

 

Inside the house we have begun to replace all the old electrical wiring and add the ductwork for the air-conditioning.  The museum is inundated with activity! We appreciate how much consideration all the contractors have for this historic building and all of its irreplaceable contents.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s